8 views

Dreams' First Open Loop -...

Dreams-Visions first open loop. Loop design and all bends done by Dreams, by hand. Total build time was around 30 hours. Mostly due to a lack of powered saws and drill bits, which would have significantly reduced time. A couple of things are likely to be adjusted at some point in the future, but for now? We're gonna call this good.
11 images